05-23-2016, 06:40 PM
(05-23-2016, 08:08 AM)Lord Popgun_imp Wrote: How long did the job take pulling the cams, doing the shims and putting everything back?
I started after work at 17:00 and I finished at 00:30, but it can be done much faster, maybe in less than 4 hours. I have to say that in my Kawasaki zephyr I used to do it in 3 hours or so. Removing the heat protection and the valve cover is quite tricky, not much space. I had to remove the front bolt of the upper cam chain guide to allow the valve cover get out from there.
