05-21-2018, 07:32 PM
Bikes paid for,paperwork’s in the mail,shipper has been paid now I just need to wait. Then it’s goimg to be another wait to get it down to the DMV for inspection and registration,feel like a kid at Christmas.
|
Now the wait begins,tick tick tick tick.............
|
|
05-21-2018, 07:32 PM
Bikes paid for,paperwork’s in the mail,shipper has been paid now I just need to wait. Then it’s goimg to be another wait to get it down to the DMV for inspection and registration,feel like a kid at Christmas.
05-21-2018, 07:53 PM
Crikey, mate. You're patient. I'd be climbing the walls.
![]() Congratulations. I hope the wait isn't too long.
05-21-2018, 09:26 PM
I’d post a picture of the thing in the crate but not that smart.
05-22-2018, 11:46 AM
Where did you get the bike?
06-02-2018, 02:40 AM
I just checked online and my bikes in San Jose about 20 miles so I will get it by Tuesday. Wish me luck the thing still looks like it just left a showroom.
06-02-2018, 07:09 AM
San Jose, huh....
I wonder if I can sneak a peek at it?
06-03-2018, 04:31 PM
(06-02-2018, 07:09 AM)Randy B_imp Wrote: San Jose, huh....it’s in a warehouse somewhere. I haven’t heard a thing from the driver,I’m not going to be happy if the driver just shows up. The bikes going to my parents house in Newark,I’m in Fremont. I told call me if it shows up and don’t sign off on anything until I get over there. I’ve already bought $400 in parts and I’ll start putting together the parts for my spoke wheel project.
06-05-2018, 12:25 PM
|
|
« Next Oldest | Next Newest »
|
| Possibly Related Threads… | |||||
| Thread | Author | Replies | Views | Last Post | |
| Order placed, now the wait begins | af_one_imp | 6 | 306 |
08-04-2017, 10:53 AM Last Post: af_one_imp |
|
| New CB1100 Standard or wait for a used DLX? | pbhati_imp | 13 | 719 |
08-21-2015, 09:21 PM Last Post: the Ferret |
|
| DART SCREENS LTD - Tick of Approval | Pterodactyl_imp | 4 | 231 |
06-25-2014, 06:32 PM Last Post: Pterodactyl_imp |
|