03-27-2014, 01:48 PM
(03-27-2014, 01:25 PM)Rboe_imp Wrote: Back in the day when we got new bikes in the handle bars had to go on. The front wheel (I think we added oil) and mirrors. There was a styrofoam top that held most of the bits we had to install.
Agreed. I bought my CB750 when it was still in the crate and it needed a lot of assembly. The crates were a lot shorter than the one shown above, due to the front wheel and bars being removed. Back then the dealer actually earned their assembly charge. It took about two hours to bolt it all together, fill the fluids and inspect.
